I often see transformer installations where the installer uses a white wire as the system bonding jumper. Is this permitted? Or is it a violation? Well, let’s look at some of the applicable rules.
A separately derived system (SDS) has no direct connection to other sources except through grounding and bonding. Grounding and bonding must be performed at the source, not on the load side, to ...